Custom BBQ Burner Series

OEM / ODM · GAS BURNER COMPONENTS

Custom BBQ Burner Manufacturer

Find a burner for your grill design or replacement range.

Compare tube, cast and ceramic infrared burners. Share your grill model, dimensions, mounting details and gas conditions so we can review the fit.

Check a Replacement PartFinal specifications and included accessories are confirmed against your selected model, drawing and sample.Source document: Custom BBQ Burner Series brochure

Style selector

Choose your starting format.

Compare twelve burner designs. Filter by type, then select a design to include in your inquiry.

12 styles shown

Prepare your product inquiry

Choose a starting point, then add your company, market and quantity to your inquiry.

Your selections: Not decided · OEM / Custom Engineering · To be confirmed

Continue with these preferences →Review these preferences in your inquiry. This is not an approved configuration or quotation.

Model-specific details

See the details behind the product.

Each feature image identifies the product it applies to. Check the selected model before including a feature in your requirements.

Tube burners5 feature images
Cast burner example6 feature images
Ceramic infrared burners7 feature images

How It Works

Review the complete gas-and-air path.

Orifice → primary air → venturi and mixing → burner ports → prototype testing. Geometry and test criteria are developed for the appliance, not the burner alone.

Gas inlet and port balance.

Match inlet, aeration, mixing and ports, then validate the complete appliance under defined test conditions.

The gas-and-air flow path

Gas inlet → primary air → venturi → mixing tube → burner head → ports.

Gas jet, primary air, mixing tube and ports
Gas jet, primary air, mixing tube and portsGold: gas jet. Blue: primary air and mixing path. Orange: flame at the ports.Conceptual schematic · Not to scale · Not a production drawing.
  1. Gas inlet / orifice

    The gas jet enters at the inlet. Confirm fuel, supply pressure and orifice.

  2. Primary-air opening

    Air enters around the gas jet. The shutter opening depends on fuel supply and geometry.

  3. Venturi throat

    Throat geometry and inlet alignment require engineering review.

  4. Mixing tube

    The gas/air mixture flows toward the burner head. Confirm mixing and distribution for the complete appliance.

  5. Burner ports

    Confirm port count, area and layout. Review heat input and port loading together.

Inlet conditions ↔ gas/air mixing ↔ port discharge behavior

What needs model-specific validation

Define and verify the project combustion window. Agree fuel, pressure, heat input, installation and acceptance criteria; no universal numerical design band is claimed.

Flashback risk
Review flame propagation and investigate inlet and port conditions under defined tests.
Project validation window
Lower and upper limits remain pending. The model result is pending tests, not a measured marker.
Lift-off / blow-off risk
Review port discharge behavior. Validate prototypes before production approval.

What this means for your project

Flame behavior
Record behavior under specified test conditions.
Emissions
Apply the agreed test method; no emissions result is claimed.
Ignition
Measure ignition behavior; no time guarantee is stated.
Test scope
Confirm the model and responsible parties; certification is not guaranteed.

Supplied burner air/gas balance principle reference, adapted for project-specific validation. Concept only, not to scale. No fixed area ratios, numerical stability limits, emissions threshold or certification approval is asserted.

Brochure & inquiry

Download the brochure or prepare your inquiry.

Use the English brochure to review the wider collection. Final configuration and any performance or testing claim require model-specific confirmation.

Download the Custom BBQ Burner Series brochure (PDF)

Buying guide

Select a burner around the appliance, not just the shape

For OEM development or an aftermarket range, shortlist the architecture and then review mounting, inlet alignment and gas conditions. A familiar silhouette or brand reference is not confirmation of fit.

Swipe or scroll sideways to see all columns.

Compare the starting points for your project
Starting pointWhen to consider itWhat to confirm
Tube designsCompare straight and shaped layouts against the appliance space.Define overall geometry, ports, mounting, inlet and material requirements.
Cast designsCompare the documented body layouts and interface arrangements.Confirm the exact material, drawing and operating configuration.
Ceramic infrared designsReview sear, back-burner and other framed formats for a defined function.Confirm face and housing geometry, installation and gas-system integration.
Replacement requestStart from the original part and a named appliance version.Collect dimensions, installation views and gas conditions before claiming compatibility.

Include these details in your first inquiry

  • Host appliance model, function and target market
  • Original part or drawing, overall dimensions and mounting references
  • Inlet/interface, gas type, supply pressure and target heat input with units
  • Required material, estimated quantity and sample/testing responsibilities
Prepare an inquiry for this product family

Buyer questions

Questions to settle before you order

Can you confirm a replacement from a photo or brand name?

Not from that alone. Provide the appliance model, original part, mounting dimensions, inlet details and gas conditions. A photo helps identify a candidate; compatibility needs the complete fit and operating-condition review.

Which burner architecture should I choose?

Start with the appliance function, available space, mounting and operating inputs. Tube, cast and ceramic infrared designs are not a universal performance ladder. Review relevant designs and agree the checks needed for the application.

Are natural gas and propane versions interchangeable?

Do not assume they are. State the required gas and supply pressure for the intended configuration. The burner and related gas-system components need to be reviewed together for the appliance.

Can I specify the material grade?

Yes, include your material requirement in the engineering brief. The actual grade and section requirements must be confirmed for the selected part, drawing and sample; they cannot be inferred from appearance.

Does a historical fit reference cover all models of a brand?

No. A brand-family or historical fit reference is a starting point for review, not a universal direct-replacement promise. Confirm the exact appliance version, dimensions, interfaces and operating configuration.

Which inquiry route should I use?

Use OEM / Custom Engineering for a new component or defined design change. Use Aftermarket & Replacement Parts when matching a part to an existing appliance. Include estimated quantity and note which drawings, samples or measurements are available.

Plan your sourcing project

Guides for your product and purchasing brief

Custom Grill Burner Specification Guide

Define the appliance, gas conditions, mounting, material and validation inputs for a custom BBQ burner. Use the checklist before engineering review.

Read the buying guide

Tube, Cast or Infrared BBQ Burners: An OEM Buying Guide

Compare tube, cast and ceramic infrared burner architectures for your grill project. Define mounting, gas conditions and the required validation.

Read the buying guide

How to Prepare an OEM Grill RFQ

Prepare an OEM grill inquiry with the market, quantity, drawings, packaging and approval requirements needed for a useful manufacturing review.

Read the buying guide

Replacement Grill Burner Measurement Checklist

Record a replacement burner’s appliance model, mounting centers, inlet and gas conditions. Prepare evidence for a fit review, not a visual guess.

Read the buying guide